| 115 |
B |
brace |
Put the brace assembly (86) in position.
|
n.[C]支柱、支撑物; vt.支撑 |
|
| 116 |
B |
bracket |
At RIB10 there are two brackets.
Pull and lower the PTP (1) with the brackets (2) until you can see the electrical connector (11).
把PTP(项目1)连同支架(项目2)拉下来,直到你能看见电气接头(项目11)。
|
n.[C]托架、支架 |
|
| 117 |
B |
brake |
Make sure that the parking brake is on.
|
n.[C]煞车 |
|
| 118 |
B |
breaker |
Make sure that the breaker 2GS and 3GS are closed.
|
n.[C](线路)断电器 |
|
| 119 |
B |
brightness |
BRT position corresponds to maximum brightness.
|
n.[U]亮度 |
|
| 120 |
B |
bundle |
Make sure that the electrical bundle is in the correct condition.
|
n.[C]线束; vt.捆紮 |
|